MAIN OVERSEAS PROJECTS:
Country | Project Name | Specification | Quantity | Date of Contract |
Zambia | Power Evacuation Transmission Project for 750MW Kafue Gorge Lower Hydropower Station Sinohydro Zambia Limited | ACSR Moose ACS 7/4.11mm | 1266.949KM 148.635KM | 2020 |
Ethiopia | Grand Ethiopian Renaissance Dam Project (GERDP) | Diameter Expanded Conductor 800 TAACSR 1440/120 ACSR 300/40 & 630/55 OPGW-24B1-90(G652) GSW80 | 6.6KM 1.05KM 21.3KM 1.7KM 2.7KM | 2020 |
Pakistan | Matiari-Lahore ± 660kV DC Transmission Project | ACSR 1250/70 | 6905.36TON | 2019 |
Philippines | Project (Kauwagan-Lala 230kV and Aurora-Lala 138kV HVAC Transmission Lines) SP18.MVIPACTL.MT-0358 | ACSR/AS 795MCM Condor | 2582.74TON (1769KM) |
2019 |
Chile | Carlos Farias Boras Proyecto Nueva Ssee Pozo Almonte, Chile | 24 FIBER OPGW 24B1-115 AAC 900MCM Cockscomb |
291 KM 1724 KM |
2019 |
Nicaragua | LPI-002-2017-MT-ENATREL " Suministros de bienes y servicios conexos del aumento de la capacidad de transformacion en las Subestaciones San Benito, Catarina, Diriamba , Acahualinca y Ticuantepe II" |
ACSS/TW Condor 795MCM | 313 KM | 2019 |
Maldives | Male Island Project of Maldives | 11kV XLPE Amoured Cable 1X150mm2 11kV XLPE Amoured Cable 1X400mm2 11kV XLPE Amoured Cable 1X500mm2 11kV XLPE Non-amoured Cable 1X630mm2 11kV XLPE Non-amoured Cable 1X800mm2 |
2.3KM 7.5KM 0.6KM 3.4KM 3.78KM |
2019 |
Colombia | Proyecto Conexion Ternium-Linea 34.5kV Sabanalarga- Ternium | 35kV Covered Conductor ACAR/XLPE/XLPE 1X600kcmil |
104KM | 2019 |
The Democratic Republic of the Congo | Extension Du Ré seau 20/0.6 KV De Kimbanseke | 20KV 3*1*150+50mm2 AL/XLPE/CTS/PVC 20KV 1*150mm2 AL/XLPE/CTS/ATA/PVC 20KV 1*150mm2 CU/XLPE/CTS/ATA/PVC 0.6/KV ABC 3*1*35+54.6+2*16mm2 0.6/KV ABC 3*1*70+54.6+2*16mm2 0.6/KV ABC 2*16mm2 |
59KM 12KM 13.5KM 223KM 83.1KM 770KM |
2019 |
Mexico | / | 477 KCMILTree Conductor 3 Layer 15KV AAAC HDPE Gray Color Cover 477 KCMILTree Conductor 3 Layer 35KV AAAC HDPE Gray Color Cover |
63KM 288KM |
2019 |
MAIN DOMESTIC PROJECTS:
Client | Project Name |
Specification |
Quantity(Ton) | Date of Contract |
![]() |
800kv Jiuquan - Hunan transmission line | ACSR 1250/70 ACSR 1250/100 |
2167.53 6072.47 |
2015 |
![]() |
500kv Dongying yellow river transmission line | ACAR 465/210 | 1918 | 2014 |
![]() |
500kv Mengshan - Anyuan transmission line | ACAR 220/230 ACAR 210/220 ACAR 210/220 |
218.51 967.04 1930.754 |
2013 |
![]() |
Xiluodu Right Bank Power Station in Guangdong ± 500kV power transmission tower with double DC works | ACSR-900/75 | 2737.35 | 2012 |
![]() |
500kV Kangding - Chongzhou transmission line project | ACSR-630/45 | 2000 | 2011 |
![]() |
750 kV Hami - Anzai transmission line project | ACSR-400-54/7 | 2609.342 | 2010 |
![]() |
Lanxin Jiayuguan-Hongliu electrification rebuilt project | ACSR/AW-300/40 | 735.34 | 2009 |
![]() |
± 800kV Yunnan-Guangdong DC transmission line project | ACSR-630/45 | 1991.493 | 2008 |
![]() |
1000kV Southeast Shanxi-Nanyang-Jingmen ultrahigh voltage AC transmission line project | ACSR-500/35 | 2703.253 | 2007 |
![]() |
500kV Huolinhe-Tongliao-Shaling transmission line project | ACSR-630/45 | 2432.332 | 2006 |